Maintenance Facility Takes Shape

A portion of the floor has been poured and walls are now going up on the Maintenance Facility in Mozambique. John Topham (below) has been assisting the mission in a number of ways since his arrival last week, including assisting Rick Cogbill and the local building team with construction.

Leveling a portion of the maintenance facility floor.

Fani learning to use the transit level.

Pouring floors Mozambique-style…one wheelbarrowful at a time!

The beautiful final product. What a blessing it will be to work on a cement floor rather than in the dirt!

The walls going up on the poured section.
(Little McGuyver, Rick and Heather Neufeld’s Jack Russell, does a quality check.)

Window frames mounted and subsequent floor section prepared for floor pouring.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Recent Posts

The Difference a Year can Make - Library Project Update

The Difference a Year

This past year it’s been exciting to watch the library[...]
Help is Needed!

Help is Needed!

Some of you may have heard of the terrible flooding[...]
The Gap--Bridged. At Last!

The Gap--Bridged. At Last!

After six months of hard work shoveling sand, pouring concrete,[...]
Home away from Home?

Home away from Home?

For the past six months we have been “home” in[...]
Put on your armor!

Put on your armor!

November 16th marked the beginning of VBS 2014!! It was[...]